Skip to content
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
🚛 Flat Rate Shipping $15.95+ GST Australia-wide! Excludes rural/remote areas and bulky and heavy items. Online only. Learn More
11

Mapegrout Fast-Set Rapido

Mapegrout Fast-Set Rapido is a high-performance, fibre-reinforced repair mortar engineered for rapid reinstatement of deteriorated concrete. With a working time of 10 minutes and traffic-ready in as little as 3 hours, it delivers exceptional strength, adhesion, and durability for structural and non-structural concrete repairs across Australian job sites.
Vendor: Mapei
SKU: MAPGROUTRAP/25
Availability: Out Of Stock
$70.62
$70.62
Prices do not include GST

Physical Properties

Strength class: En 1504-3 r3
Type: Pcc
Colour: Grey
Aggregate size: 1 mm
Consistency: Powder, thixotropic when mixed
Mixing ratio: 100 parts product : 15–16 parts water
Pot life: ≈ 10 minutes at 20°c
Setting time: < 30 minutes
Layer thickness: 20–25 mm
Density of mix: 2150 kg/m³
Compressive strength: 3 hrs >10 mpa, 1 day >20 mpa, 7 days >28 mpa, 28 days >40 mpa
Flexural strength: 3 hrs >4.0 mpa, 28 days >8.0 mpa
Elastic modulus: 24 gpa
Bond strength (pull-off): >1.5 mpa
Capillary absorption: <0.05 kg/m²·h
Thermal compatibility: Freeze-thaw with de-icing salts >1.5 mpa
Reaction to fire: Euroclass a1
Consumption: 18 kg/m² per cm thickness
Packaging: 25 kg bags
Storage: 12 months in unopened packaging at +5°c to +35°c
Shipping & Delivery

$15.95 + GST for Australia-wide shipping, excluding DG, oversized, long-length, and bagged items over 15kg. Rural, remote areas and site deliveries are also ineligible. If your order includes any of these, we will contact you to arrange additional freight fees. Online purchases only.

Use Mapegrout Fast-Set Rapido for: Rapid reinstatement of deteriorated concrete structures, industrial flooring, pipe joints, surface defect repairs, and waterproofing preparation.

Mapegrout Fast-Set Rapido: A Technical Overview

Mapegrout Fast-Set Rapido is a pre-blended, fibre-reinforced, shrinkage-compensated mortar designed for fast, durable structural and non-structural concrete repairs. With its thixotropic formulation, it can be applied up to 25 mm on vertical or overhead substrates without slump. It achieves compressive strengths exceeding 10 MPa within 3 hours and 40 MPa after 28 days, providing professionals with a high-performance repair solution that allows faster return-to-service on critical projects. Its superior adhesion, low capillary absorption, and high resistance to freeze-thaw cycles ensure long-term durability even in aggressive Australian conditions.
3 hrs
Traffic-ready compressive strength >10 MPa

Core Features & Specifications

  • Rapid-setting: workable for 10 minutes, sets in <30 minutes.
  • Fibre-reinforced & shrinkage-compensated for crack resistance.
  • Thixotropic mortar – apply 20–25 mm in vertical repairs without slump.
  • High early strength: >10 MPa (3 hrs), >20 MPa (1 day), >40 MPa (28 days).
  • Bond strength by pull-off: >1.5 MPa ensuring reliable adhesion to old concrete.
  • Excellent impermeability to water and resistance to wear.
  • Compliant with EN 1504-3, Class R3 structural repair mortar.

The Mapegrout Fast-Set Rapido Advantage

  • Return areas to service faster – walkable/trafficable after 2–3 hours.
  • Reduce labour costs with rapid curing and fewer call-backs.
  • Designed for Australian jobsite extremes (+5°C to +35°C application range).
  • Compatible with Elastocolor protective coatings after 3 days.
  • Engineered for structural integrity with Euroclass A1 fire rating and 24 GPa modulus.

Proactive Troubleshooting

Scenario: Re-tempering the mix with water after setting begins

Potential Outcome: Loss of strength and adhesion, leading to patch failure.

Adheseal Best Practice: Mix only quantities usable within 10 minutes. Never add water after initial set begins.

Scenario: Applying to dry, dusty, or contaminated substrates

Potential Outcome: Delamination and reduced bond strength.

Adheseal Best Practice: Mechanically prepare concrete, saturate with water, and use bonding slurry for optimal adhesion.

Applications in Practice: Trade Scenarios

For Builders (On-Site Applicator): Structural patching on beams & pillars

The Professional's Challenge

Delays in structural repair can compromise timelines and increase costs when beams or pillars show spalling due to rebar corrosion.

The Adheseal Solution: Engineered Certainty in Practice

Apply Mapegrout Fast-Set Rapido at 25 mm per layer, ensuring structural reinstatement within hours. Achieves >10 MPa in 3 hours, allowing project progression the same day.

Best Practice Note

Always coat exposed reinforcing with Mapefer before patching to prevent future corrosion.

For Tilers (Specifier/Remedial): Substrate repairs before waterproofing

The Professional's Challenge

Uneven concrete surfaces, shrinkage cracks, and voids compromise waterproofing system adhesion.

The Adheseal Solution: Engineered Certainty in Practice

Mapegrout Fast-Set Rapido provides smooth, durable patch repairs ready for Planiseal 88 or under-tile membranes within hours, ensuring long-term watertight integrity.

Best Practice Note

Finish repairs with a steel float to minimise high spots and ensure maximum coverage of subsequent membranes.

Frequently Asked Questions

What is the working time and set time at 20 °C?

Working time (pot life) is approximately 10 minutes at 20 °C. The product sets in <30 minutes. Plan mixing in small batches and place immediately. Warmer weather shortens these times; cooler weather extends them. Do not attempt to re-temper by adding water once setting has begun.

How thick can I apply Mapegrout Fast-Set Rapido per layer on vertical repairs?

Thanks to its thixotropic formulation, apply 20–25 mm per layer on vertical/overhead substrates without slump. For deeper rebuilds, apply multiple lifts at roughly 15-minute intervals. Scratch or key each fresh layer to enhance inter-coat adhesion.

When can patched floors be returned to traffic?

Under typical conditions (20 °C), patches are ready for light traffic in ~3 hours once compressive strength exceeds 10 MPa. Protect from rapid moisture loss during early cure and avoid premature loading in cold conditions.

Do I need a bonding slurry on very absorbent concrete?

Yes—on dry or highly absorbent substrates, saturate the surface (SSD) and brush on a bonding slurry of 1 part powder to 0.24–0.25 parts water. Place the mortar onto the fresh slurry for optimal bond strength and reduced suction.

Is it suitable for precision anchors or spray application?

No. For precision anchoring, use a dedicated grout such as Mapefill or Mapefill R. For spray-applied mortar repairs, use Mapegrout Thixotropic. Mapegrout Fast-Set Rapido is intended for trowelled placement.

Can I leave the repair uncoated as a façade finish?

Not recommended. The mortar may change colour after hardening and is not intended as a final architectural finish. Where a protective or decorative finish is required, over-coat with the Elastocolor system after approximately 3 days at 20 °C.

Applications & Benefits

Product applications, benefits, and relevant trades
Application / Use Case Key Benefit Primary Trades
Patching spalled concrete on beams, pillars & balconies Rapid structural reinstatement; >10 MPa in ~3 hrs; thixotropic non-slump placement Builders, Remedial Contractors
Industrial floor repairs & edge rebuilds Fast return-to-service; dense, wear-resistant finish with steel float Builders, Flooring/Remedial
Smoothing surface defects (honeycombing, voids, tie-holes) Uniform, coat-ready substrate; excellent adhesion to old concrete Builders, Tilers, Remedial
Sealing surface cracks in concrete/renders Low capillary absorption; durable crack fill compatible with coatings Builders, Remedial
Assembly & repair of concrete pipes High early strength and water impermeability for serviceability Civil/Plumbers, Builders
Pointing between bricks before waterproofing (e.g., Planiseal) Improves watertightness and coating coverage; rapid turnaround Tilers, Waterproofers, Builders

Applying Mapegrout Fast-Set Rapido: Enhanced Protocols & Best Practices

  1. Surface Preparation

    Remove unsound concrete and contaminants to expose sound aggregate. Achieve a rough, open surface (≈ ≥5 mm amplitude). Clean reinforcement to bright metal where exposed, then coat with anti-corrosion protection.

    Mechanical Removal

    Hydro-scarify, grind, or chip back to sound concrete; square patch edges to improve load transfer.

    Steel Preparation

    Abrasive blast rebars; apply Mapefer or Mapefer 1K as directed prior to patching.

    Timing: Complete steel priming and allow to dry before placing mortar.
    Pro Tip: Aim for SSD (saturated surface-dry): damp but free of standing water to prevent bond loss.
  2. Pre-Wetting & Bonding Slurry

    Bring substrate to SSD, then apply a bonding slurry to high-suction areas immediately prior to placement.

    Bonding Slurry Mix

    Blend 1 part powder : 0.24–0.25 parts water to a brushable consistency; scrub into the surface.

    Wet-on-Wet Placement

    Place the repair mortar while the slurry remains fresh to maximise adhesion.

    Timing: Place mortar immediately after slurry application; do not allow a skin to form.
    Pro Tip: On floors, slurry helps control suction and improves finishing.
  3. Mixing

    Using a clean pail, add water then powder and mix mechanically to a lump-free, thixotropic mortar.

    Water Demand

    Per 25 kg bag use 3.75–4.0 L water (≈15–16%). Mix 2–3 minutes with a low-speed paddle.

    Batch Control

    Mix only what you can place within ~10 minutes at 20 °C. Do not add water once setting begins.

    Timing: Immediate placement after mixing—fast setting system.
    Pro Tip: In hot weather, use cool water and shade materials; in cold weather, use lukewarm water and keep bags warm.
  4. Placement – Structural Patching

    Trowel mortar firmly into the cavity, compacting to remove air and ensure full contact with edges and steel.

    Layer Thickness

    Apply up to 20–25 mm per lift on vertical/overhead surfaces without slump.

    Multiple Lifts

    For deeper repairs, apply subsequent lifts at ~15 minutes intervals; lightly notch or key for adhesion.

    Timing: Finish promptly; system sets in <30 minutes at 20 °C.
    Pro Tip: Tool with a steel float for a dense, coat-ready surface.
  5. Placement – Floor Patching & Smoothing

    On SSD substrate with fresh slurry, spread and compact the mortar; steel-float to finish and feather as required.

    Edge Detailing

    Patch boundaries should be cut square; avoid feathering onto weak or dusty material.

    Thickness Control

    Observe minimum thickness that ensures durability; for thin film cosmetic smoothing, consider multiple light passes.

    Timing: Light traffic typically after ~3 hours at 20 °C.
    Pro Tip: Protect early-age surfaces from draughts and direct sun to minimise plastic shrinkage.
  6. Curing, Over-Coating & Clean-Up

    After finishing, protect from rapid evaporation with polyethylene sheets or wet coverings. Clean tools with water before the product hardens.

    Protection

    Maintain moisture for at least the first 24 hours on structural patches to enhance durability.

    Over-Coating

    Apply Elastocolor coatings after approximately 3 days at 20 °C. Remove residues mechanically after set.

    Timing: Return to service varies with temperature and load—always confirm strength has developed sufficiently.
    Pro Tip: In cool conditions, extend protection and allow extra time before loading.

Limitations & Safety

Product Limitations

!
Do not add water after setting begins; never re-temper. Mix small batches usable within ~10 minutes.
!
Do not add cement, lime, gypsum, or other admixtures; use as supplied.
!
Not suitable for precision anchoring. Use Mapefill or Mapefill R.
!
Not for spray application. Use Mapegrout Thixotropic.
!
Apply only to clean, SSD substrates; avoid dry, dusty, or contaminated surfaces.
!
Application temperature range +5 °C to +35 °C. Store bags cool and shaded in hot weather.
!
After hardening the colour may vary; not recommended as a façade finish. Over-coat with Elastocolor after ~3 days.
!
Do not use if packaging is damaged or previously opened; shelf life ~12 months unopened (dry storage, +5 °C to +35 °C).

Safety & Handling Requirements

🧤
Personal Protective Equipment

Wear chemical-resistant gloves, safety glasses, long sleeves and pants. When mixing/pouring powder, use a P2 (or N95) dust mask/respirator to avoid inhalation of cementitious dust.

🪟
Ventilation Requirements

Mix and apply in well-ventilated areas. Avoid creating airborne dust. Use local extraction where feasible.

🔥
Fire & Handling Precautions

Non-combustible cementitious material. Store dry in original, closed bags. Keep away from moisture ingress and incompatible chemicals.

⛑️
Emergency First Aid
Eyes:
Rinse cautiously with water for several minutes; remove contact lenses if present and easy to do. Continue rinsing and seek medical attention.
Skin:
Wash with soap and water; remove contaminated clothing. Seek medical advice if irritation persists.
Inhaled:
Move to fresh air and rest in a comfortable position. Get medical attention if symptoms occur.
Swallowed:
Rinse mouth. Do not induce vomiting. Seek medical advice immediately.

Refer to the current Safety Data Sheet (SDS) for full health and safety information. Seek medical attention immediately for serious exposure.

Mapegrout Fast-Set Rapido Application Guide

Concrete (Structural Substrates)

Mechanically remove all deteriorated or contaminated concrete to sound substrate with a rough, open texture (target irregularities ≥ 5 mm). Clean of dust, laitance, oil/grease, coatings and weak repairs. Achieve SSD (saturated surface-dry) before placing.

Bonding slurry recommended on absorbent substrates

Brush a slurry of 1 : 0.24–0.25 (powder : water) onto SSD concrete and place mortar wet-on-wet.

Bonding Slurry (Mapegrout Fast-Set Rapido + water)

Exposed Reinforcing Steel

Abrasive blast to bright metal to remove rust, scale, contaminants. Ensure clean steel and adequate cover in the repair design.

Anti-corrosion coating required

Coat prepared reinforcement prior to patching to inhibit further corrosion.

Mapefer or Mapefer 1K

Industrial Concrete Flooring

Remove loose/damaged concrete. Chisel patch edges square and provide minimum depth for interlock. Clean thoroughly; bring to SSD.

Bonding slurry recommended

Brush on slurry (1 : 0.24–0.25) to control suction; place mortar immediately and steel-float to finish.

Bonding Slurry (Mapegrout Fast-Set Rapido + water)

Concrete Pipes (Assembly & Edge Repairs)

Clean mating surfaces; roughen glossy/latanced areas. SSD condition prior to placement.

No dedicated primer typically required

Use bonding slurry where high suction or difficult adhesion is expected.

Bonding Slurry (optional)

Brick & Masonry (Pointing prior to Waterproofing)

Rake out weak material; clean dust/debris. Dampen to SSD to avoid rapid water loss. Fill joints and defects flush.

No primer typically required

Allow initial hardening before subsequent waterproofing (e.g., Planiseal systems) as per system instructions.

Mapegrout Fast-Set Rapido
Vendor: Mapei
Mapegrout Fast-Set Rapido
$70.62
Vendor: Mapei
Mapegrout Fast-Set Rapido
$70.62

Alternative Products

Need Help with Mapegrout Fast-Set Rapido?

Need more information about this product? Hit the button below and reach out to one of our experts now.

Recently Viewed Products

Thanks for subscribing!

This email has been registered!

Shop the look
Choose Options
Recently Viewed
Edit Option
Compare
Product SKUDescription Collection Availability Product Type Other Details
this is just a warning
Login
Shopping Cart
0 items