Price Per Unit: $10.90
Price Per Box: $9.81
Potential Outcome: Restricted movement causes cohesive/adhesive failure or substrate stress.
Adheseal Best Practice: Use correct backer rod or bond-breaker tape to ensure two-sided adhesion per joint design guidance.
Potential Outcome: Poor adhesion and bubbling; premature failure.
Adheseal Best Practice: Clean using the two-wipe method with suitable solvent; ensure substrates are dry and concrete is cured (≥28 days) before application.
Movement and thermal cycling on exposed panels demand a flexible, UV-stable sealant that tools cleanly and stays put without primer delays.
Design joints at ~2:1 (width:depth). For 20 mm width, target ~10 mm depth with backer rod. Gun Hi-Flex Construction + and tool within 10–15 min for a smooth, elastic finish rated to ±50% movement.
Mask edges for crisp lines and remove tape before skin forms. Avoid trapping air while filling—continuous, steady bead prevents bubbles.
Modern facades require primerless bonding to powder-coated aluminium and glass with reliable UV stability and neat, low-mess presentation.
Lightly abrade non-porous frames, clean with appropriate surface prep, then apply a continuous bead and tool off for a weather-tight, non-staining seal that can be painted if required (test compatibility).
Maintain two-sided adhesion around frames by using bond-breaker tape on flat interfaces to allow thermal movement without stress.
Need a clean, non-corrosive adhesive/sealant to bond dissimilar materials and manage differential movement with minimal rework.
Apply a triangular bead (nozzle cut at 90° then wedged) and compress parts to ≥2 mm final bond line. The low-modulus, high-elongation hybrid manages thermal mismatch without print-through.
For critical bonds, pre-treat metals and plastics as directed and verify adhesion with site pull tests before production runs.
Usually no—Hi-Flex Construction + achieves strong primerless adhesion on many non-porous substrates. For critical or high-exposure applications, light abrasion and surface prep are recommended, with adhesion testing prior to installation.
Aim for a ~2:1 width:depth ratio. Internal joints min 5 mm width/depth; external joints min 12 mm width. Use backer rod for joints >10 mm deep and avoid three-sided adhesion with bond-breaker tape.
Ensure substrates are structurally sound, clean, dry and free of dust, oils, release agents and moisture. Concrete must be cured ≥28 days.
Wipe with suitable solvent using a clean cloth; immediately follow with a second clean, dry wipe. Replace cloths frequently.
Mask joint edges for neat lines; remove tape before skin forms.
Many non-porous substrates bond primerless after surface prep. For porous/critical joints, prime as specified and allow 30 min–2 h.
Light abrasion then surface prep. Confirm with adhesion testing for critical works.
Apply primer by brush; allow to flash off (30 min–2 h) before sealing.
Target ~2:1 width:depth. Internal joints min 5 mm; external min 12 mm. Use backer rod for depth control; avoid three-sided adhesion with bond-breaker tape.
Select rod ~25% larger than joint width; place to required depth.
Acceptable with care—do not damage the skin to avoid gassing.
Apply between +5°C and +40°C. Push the bead ahead of the nozzle to avoid air entrapment; fill completely and tool before skin forms (~10–15 min).
Cut nozzle at ~45° to joint width; maintain nozzle contact with both sides; tool with a moistened spatula.
Cut nozzle at 90°; create triangular bead; assemble parts to ≥2 mm bond line.
Wear gloves and safety glasses during application and clean-up. Wash hands before eating, drinking or smoking. Launder contaminated clothing before reuse.
Use in well-ventilated areas. Avoid inhaling vapours. For confined or poorly ventilated spaces, increase airflow and limit exposure time.
Keep away from ignition sources when using solvents for clean-up. Store sealed in a cool, dry place (10–35°C).
Seek medical attention immediately in all cases of serious exposure.
Wear gloves and safety glasses. Wash hands before eating, drinking or smoking. Launder contaminated clothing before reuse.
Use in well-ventilated areas. Avoid vapour build-up; ensure adequate airflow for moisture-cure chemistry.
Keep ignition sources away when using solvents for cleaning. Observe storage conditions and shelf-life.
Seek medical attention immediately in all cases of serious exposure.
Lightly abrade with a fine abrasive pad; clean using appropriate surface prep with the two-wipe method. Ensure surfaces are dry and free from oil/contaminants.
Allow 30 min–2 h between prep and application.
Adheseal 50A Surface PrepSubstrates must be sound, clean, dry and cured—concrete ≥28 days. Remove dust, laitance, curing agents and contaminants.
Brush apply primer; allow 30 min–2 h before sealing.
Everflex SupaprimeLight abrasion then two-wipe clean. Verify compatibility; conduct adhesion tests.
Application / Use Case | Key Benefit | Primary Trades |
---|---|---|
Perimeter sealing of windows | Primerless adhesion, clean tooling, UV stability | Glaziers, Builders |
Curtain walls & facade panels | Low modulus manages thermal movement | Glaziers, Facade Contractors |
Precast / tilt-up expansion joints | ±50% movement; durable weather seal | Builders |
Product | SKU | Description | Collection | Availability | Product Type | Other Details |
---|